Work begins on converting an existing ambience store into a freezer unit by stripping all the existing double skin membrane and replacing with 100mm composite cladding to obtain the new clientel needing freezer space, job duration was expected to be 4 calendar weeks although already in front of scheduleand hoping to be finished in 15 – 18 days.

  